Certified · Inspected · Trusted By
Feature — Code Compliance & Turnaround
The shop that refineries call on a Friday at 4 p.m.
Every vessel that leaves this shop carries an ASME Code Stamp and a complete documentation package — material certifications, weld procedure qualifications, radiograph records, and the inspector's signature. Not because it's required. Because a leaking heat exchanger at 2 a.m. is not the time to discover a gap in paperwork.
Since 1987, we have fabricated pressure vessels for crude-oil refineries in Texas, craft breweries in Colorado, and the century-old steam distribution systems underneath university campuses in the Northeast. The work is different. The standard is identical: full code compliance, first-inspection pass, no callbacks.
New Vessel Fabrication
ASME Section VIII Div. 1 pressure vessels from 6″ to 144″ diameter. Carbon steel, chrome-moly, stainless, duplex.
Repair & Alteration
National Board R-Stamp repairs on boiler drums, superheaters, economizers, and heat exchangers. Documented, inspected, code-stamped.
Turnaround Fabrication
Shell-and-tube exchangers delivered in 3–6 weeks during scheduled plant shutdowns. Expedited 10-day service available.
On-Site Field Work
Certified welders dispatched to your facility for emergency repairs, tube replacements, and post-weld heat treatment.
Photo Essay — Completed Vessels
In situ. On spec. On time.
Craft Brewery Brite Tanks — Denver, CO

Crude Pre-Heat Exchanger — Port Arthur, TX

Campus Central Plant Boiler — Boston, MA

Hospital Steam Distribution Header — Chicago, IL

Shell-and-Tube Exchanger in Production

Municipal Waterworks Steam Plant — Kansas City, KS

Ready to spec your next vessel?
Tell us the vessel type, pressure rating, and timeline. We'll respond with a preliminary budget and lead time within one business day — or call if it can't wait.
